Notes:
10/25/2019 11:09:39 AM
SECOND STORY: 2 BEDROOMS, 1 BATHROOM, 1 GAME ROOM, 1 POWDER ROOM
001. COMPLIANCE WITH THE AMENDED ZONING ORDINANCE (13-06-36) AND ALL DEED RESTRICTIONS SHOWN ON THE FINAL PLAT (DRIVEWAY; FENCE).
002. COMPLIANCE WITH THE 2015 BUILDING CODES, LOCAL AMENDMENTS, PD AND FINAL PLAT REQUIREMENTS.
003. TERMITE BARRIER PROTECTION REQ'D AT ALL SLAB PENETRATIONS.
014. BEAMS=10"W X 28"D.
023. FRONT ENTRY CURB CUT PER ENCLOSED DESIGN SKETCH WITH DRIVEWAY MAXIMUM WIDTH 24 FEET.
033. ALL SIDING,TRIM,SHAKES AND SIMILAR NON-MASONRY EXTERIOR SURFACE COVERINGS MUST BE OF CEMENTITIOUS MATERIAL.
050. DOUBLE UNDERLAYMENT REQUIRED ON COMPOSITION ROOFS WITH A 4:12 PITCH OR LESS
051. CO DETECTORS REQ'D ON ELECTRICAL LEGEND AND ELECTRICAL PLAN. (1) PER FLOOR MINIMUM WITH (1) ON THE AC SIDE OF THE GARAGE DOOR AND OUTSIDE THE VICINITY OF EACH BEDROOM.
058. GREEN BUILDING VENTILATION REQUIREMENT BASED ON ASHARAE 62.2 STANDARD.
059. DRIVEWAY, LEAD WALK AND GARAGE DOOR ENHANCEMENT AND TREATMENT PER THE ENCLOSED DETAIL
060. THIS SUBDIVISION MAY REQUIRE H.O.A. DESIGN APPROVAL PRIOR TO PERMIT AND CONSTRUCTION.
061. SEE ENCLOSED SHEET FOR WOOD FENCE CONSTRUCTION AND (OR) ORNAMENTAL IRON AS PER PD REQUIREMENT.