Notes:
6/26/2019 3:01:36 PM
GENERAL NOTES FOR THE INTERIOR REMODEL OF FIRST AND SECOND FLOOR OF HOUSE. HOME OWNER IS ACTING AS THE GERERAL CONTRACTOR AND WILL PROVIDE M, E, P,’S AS NEEDED. SEE ENGINEERS DETAIL FOR INTERIOR OF STRUCTURE AND ROOF DETAIL
ELECTRICAL
* ALL WORK PERFORMED MUST MEET THE 2014 NEC AND 2015 IRC STANDARDS AND ABIDE BY THE CITY OF FRISCO COMPREHENSIVE ZONING ORDINANCE, AND ALL OTHER CITY ORDIANCES.
01. MINIMUM #12 COPPER CONDUCTORS PERMITTED EXCEPT FOR CONTROLS.
02. NO ALUMINIM WIRE PERMITTED OR #14
PLUMBING
* ALL WORK PERFORMED MUST MEET THE 2015 IRC AND 2015 IMC STANDARDS AND ABIDE BY THE CITY OF FRISCO COMPREHENSIVE ZONING ORDINANCE, AND ALL OTHER CITY ORDINANCES.
** A GASLINE PRESSURE TEST IS REQUIRED WHEN ADDING A GAS APPLIANCE. ***
**A DISHWASHING MACHINE SHALL BE PROTECTED AGAINST BACKFLOW BY AN AIR
GAP OR BACKFLOW PREVENTER IN ACCORDANCE WITH SECTION 608.
**COMPRESSION TYPE MECHANICAL JOINTS ARE NOT PERMITTED UNDERGROUND**
MECHANICAL
401. * ALL WORK PERFORMED MUST MEET THE 2015 IRC STANDARDS AND ABIDE BY THE CITY OF FRISCO COMPREHENSIVE ZONING ORDINANCE, AND ALL OTHER CITY ORDINANCES.