Notes:
6/4/2019 4:11:08 PM
115. * 5' TURNING RADIUS REQUIRED AT THE APPROACH.
116. * 8" DEPTH THE FIRST FOOT IN FROM THE LIP OF THE STREET/ALLEY.
117. * IF METER WITHIN 3' OF DRIVEWAY, NEED TO INSTALL BALLARD.
118. *** NEED A FLATWORK INSPECTION BEFORE THE POUR. ***
*DRIVEWAY MUST BE THE SAME WIDTH FROM THE PROPERTY LINE TO THE CURB CUT FLARE POINT.
*FLARE POINT TO WIDEN DRIVEWAY MUST BE AT OR BEHIND PROPERTY LINE.
*MAXIMUM WIDTH OF DRIVEWAY FROM THE STREET TO THE PROPERTY LINE IS 24’. BEYOND THE PROPERTY LINE CAN BE UP TO 34 FEET WIDE, ON FRONT ENTRY LOTS AND INCLUDE A REINFORCED CONCRETE TURN-DOWN FOR EROSION CONTROL.
*DRIVEWAY SLAB SHALL BE AT LEAST 24" OR MORE SEPARATION BETWEEN SLAB AND SIDE YARD PROPERTY LINE.*
***ANY WORK DONE IN ROW REQUIRES A SEPARATE PERMIT FROM PUBLIC WORKS.***
***DRIVEWAY APPROACH MUST MEET ROW STANDARDS FOR CULVERT REQUIREMENTS***
113. SUBJECT TO FIELD INSPECTION APPROVAL. CALL (972) 292-5386 FOR INSPECTION.
153. CITY OF FRISCO APPROVAL IS NOT IN LIEU OF HOMEOWNER ASSOCIATION (HOA) REQUIREMENTS. REFERENCE HOA BYLAWS FOR SUBDIVISION REQUIREMENTS.