Notes:
3/6/2019 12:46:33 PM
SECOND STORY: 3 BDROOM, 2 BATHROOM, 1 MEDIA ROOM , 1 GAME ROOM
001. COMPLIANCE WITH THE AMENDED ZONING ORDINANCE (13-06-36) AND ALL DEED RESTRICTIONS SHOWN ON THE FINAL PLAT (DRIVEWAY; FENCE).
002. COMPLIANCE WITH THE 2015 BUILDING CODES, LOCAL AMENDMENTS, PD AND FINAL PLAT REQUIREMENTS.
003. TERMITE BARRIER PROTECTION REQ'D AT ALL SLAB PENETRATIONS.
014. BEAMS=10"W X 28"D.
029. PROVIDE EXPANSION JOINTS IN MASONARY FACADE.
046. SECOND STORY WINDOWS (SIZE AND TYPE) MUST INCLUDE HEAD HEIGHT
048. MEDIA ROOM WITH CLOTHING STORAGE MUST HAVE A CODE COMPLIANT EGRESS WINDOW.
050. DOUBLE UNDERLAYMENT REQUIRED ON COMPOSITION ROOFS WITH A 4:12 PITCH OR LESS
058. GREEN BUILDING VENTILATION REQUIREMENT BASED ON ASHARAE 62.2 STANDARD.
060. THIS SUBDIVISION MAY REQUIRE H.O.A. DESIGN APPROVAL PRIOR TO PERMIT AND CONSTRUCTION.
061. SEE ENCLOSED SHEET FOR WOOD FENCE CONSTRUCTION AND (OR) ORNAMENTAL IRON AS PER PD REQUIREMENT.