Notes:
1/29/2019 1:39:16 PM
ALL WORK PERFORMED MUST MEET THE 2015 IRC STANDARDS AND ABIDE BY THE CITY OF FRISCO COMPREHENSIVE ZONING ORDINANCE, AND ALL OTHER CITY ORDINANCES.
*** NEED A FLATWORK INSPECTION BEFORE THE POUR. ***
* OUTSIDE OF POST CAN NOT ENCROACH THE 10' REAR YARD SETBACK ALLOWED FOR OPEN AIR ARBOR WITH OPEN TOP ROOF, UP TO THREE FOOT OVER-HANG IS ALLOWED.
*** FIREPLACE, FIRE PIT, (SINK, ETC) NOT REQUESTED OR PERMITTED. ***
***LAG BOLT MUST PENETRATE MAIN HOUSE STUD MIN 1 ½".
SLATS SHOULD BE A DISTANCE APART EQUAL TO THE WIDTH OF THE SLAT. ***MAY NOT INTRUDE ON SIDE YARD SETBACKS.
A GAS LINE PRESSURE TEST IS REQUIRED WHEN ADDING GAS TO AN OUTDOOR
APPLIANCE**
MUST BE 3’ FROM SIDE PROPERTY LINE ONCE PAST REAR BUILD LINE. MUST BE 10’ FROM REAR PROPERTY LINE
SUBJECT TO FIELD INSPECTION APPROVAL. CALL (972) 292-5386 FOR INSPECTION.
THE SPACING BETWEEN ARBOR SLATS/RUNNERS SHOULD BE EQUAL TO THE WIDTH OF THE SLAT. EX. 1’’X 6’’ BOARD SHOULD HAVE A 6’’ SPACING
CITY OF FRISCO APPROVAL IS NOT IN LIEU OF HOMEOWNER ASSOCIATION (HOA) REQUIREMENTS. REFERENCE HOA BYLAWS FOR SUBDIVISION REQUIREMENTS.
2/13/2019 9:43:10 AM
**ADDED OUTDOOR PATIO HEATER**