Notes:
1/30/2019 3:59:40 PM
ALL WORK PERFORMED MUST MEET THE 2015 IRC STANDARDS AND ABIDE BY THE CITY OF FRISCO COMPREHENSIVE ZONING ORDINANCE, AND ALL OTHER CITY ORDINANCES.
*** NEED A FLATWORK INSPECTION BEFORE THE POUR. ***
*** ARBOR, PATIO COVER, FIREPLACE, FIRE PIT, , SINK, ETC) NOT REQUESTED OR PERMITTED.
* CONCRETE PATIO MUST BE AT LEAST THREE FEET FROM REAR PROPERTY LINE AND THREE FEET FROM SIDE PROPERTY LINES, (CAN BE ONE FOOT FROM REAR PROPERTY & ONE FOOT FROM SIDE PROPERTY IF NOT BACKING UP TO A LOT.)
SUBJECT TO FIELD INSPECTION APPROVAL. CALL (972) 292-5386 FOR INSPECTION.
A GAS LINE PRESSURE TEST IS REQUIRED WHEN ADDING GAS TO AN OUTDOOR
APPLIANCE**
MUST BE 3’ FROM SIDE PROPERTY LINE ONCE PAST REAR BUILD LINE. MUST BE 10’ FROM REAR PROPERTY LINE.
**MAY NOT ADVERSELY AFFECT DRAINAGE OF NEIGHBORING PROPERTIES**
CITY OF FRISCO APPROVAL IS NOT IN LIEU OF HOMEOWNER ASSOCIATION (HOA) REQUIREMENTS. REFERENCE HOA BYLAWS FOR SUBDIVISION REQUIREMENTS.