Notes:
1/16/2019 9:31:31 AM
All work performed must meet the 2015 IBC standards, local amendments and abide by the city of Frisco comprehensive zoning ordinance and all other city ordinances.
Subject to field inspections.
Call (972) 292-5386 for inspection.
* Low Slope Roofs are subject to the "Cool roof" program (Energy Star) with minimum; (IECC 402.2.1.1) Low Slope Roofs {less than 2:12} Initial Solar Reflectance value of 0.70 & 0.55 (after 3 years); Initial Thermal Emittance of 0.75 or more & 0.75 (after 3 years). Initial Solar Reflectance Index {SRI} of 82 and 64 (after 3 years ). Manufacturer’s documentation of selected roofing materials must be submitted in details. (info must include the "after-3-years" values as required). Skylights to be code compliant with (sec.2405 IBC) & fully detailed as per required construction. http://www.energystar.gov/index.cfm?fuseaction=find_a_product.showProductGroup&pgw_code=RO
*Steep slope roofs (slope of 2:12 or greater) are required to be energy efficient (not required to be a cool roof).