Notes:
10/29/2018 1:32:46 PM
196. DRIVEWAY EXTENSION
197. ALL WORK PERFORMED MUST MEET THE 2015 IRC STANDARDS AND ABIDE BY THE CITY OF FRISCO COMPREHENSIVE ZONING ORDINANCE AND ALL OTHER CITY ORDINANCES
198. 5' TURNING RADIUS REQUIRED AT THE APPROACH
199. 8" DEPTH THE FIRST FOOT IN FROM THE LIP OF THE STREET/ALLEY
200. IF METER WITHIN 3' OF DRIVEWAY, NEED TO INSTALL BOLLARD
201 NEED A FLATWORK INSPECTION BEFORE THE POUR. ***
*DRIVEWAY MUST BE THE SAME WIDTH FROM THE PROPERTY LINE TO THE CURB CUT FLARE POINT
202. FLARE POINT TO WIDEN DRIVEWAY MUST BE AT OR BEHIND PROPERTY LINE
203. MAXIMUMIMUM WIDTH OF DRIVEWAY FROM THE STREET TO THE PROPERTY LINE IS 24. BEYOND THE PROPERTY LINE CAN BE UP TO 34 FEET WIDE, ON FRONT ENTRY LOTS AND INCLUDE A REINFORCED CONCRETE TURN-DOWN FOR EROSION CONTROL
204. DRIVEWAY SLAB SHALL BE A MIN OF 24"" FROM THE SIDE YARD PROPERTY LINE. *SUBJECT TO FIELD INSPECTION APPROVAL. CALL (972) 292-5386 FOR INSPECTION
205. MAY NOT ADVERSELY AFFECT DRAINAGE OF NEIGHBORING PROPERTIES
206. CITY OF FRISCO APPROVAL IS NOT IN LIEU OF HOMEOWNER ASSOCIATION (HOA) REQUIREMENTS. REFERENCE HOA BYLAWS FOR SUBDIVISION REQUIREMENTS.
207. ANY WORK DONE IN ROW REQUIRES A SEPARATE PERMIT FROM PUBLIC WORKS
208. DRIVEWAYS ON CORNER LOTS MUST BE REVIEWED BY ENGINEERING