Notes:
10/4/2018 11:41:51 AM
186. CONCRETE PATIO
190. ARBOR, PATIO COVER, FIREPLACE, FIRE PIT, OUTDOOR KITCHEN (BBQ GRILL, SINK, ETC) NOT REQUESTED OR PERMITTED
187. ALL WORK PERFORMED MUST MEET THE 2015 IRC STANDARDS AND ABIDE BY THE CITY OF FRISCO COMPREHENSIVE ZONING ORDINANCE AND ALL OTHER CITY ORDINANCES
188. NEED A FLATWORK INSPECTION BEFORE THE POUR
189. NO ELECTRICAL OR PLUMBING PERMIT REQUESTED OR ISSUED
191. CONCRETE PATIO MUST BE AT LEAST THREE FEET FROM REAR PROPERTY LINE AND THREE FEET FROM SIDE PROPERTY LINES, (CAN BE ONE FOOT FROM REAR PROPERTY \u0026 ONE FOOT FROM SIDE PROPERTY IF NOT BACKING UP TO A LOT.)
192. SUBJECT TO FIELD INSPECTION APPROVAL. CALL (972) 292-5386 FOR INSPECTION
193. MAY NOT ADVERSELY AFFECT DRAINAGE OF NEIGHBORING PROPERTIES
194. CITY OF FRISCO APPROVAL IS NOT IN LIEU OF HOMEOWNER ASSOCIATION (HOA) REQUIREMENTS. REFERENCE HOA BYLAWS FOR SUBDIVISION REQUIREMENTS
Bonding:
• All fixed metal parts that are within 5 feet horizontally of the inside walls of the pool, spa or hot tub and that are within 12 feet above the maximum water level of the pool shall be bonded together.
* ALL WORK PERFORMED MUST MEET THE 2015 IRC STANDARDS AND ABIDE BY THE CITY OF FRISCO COMPREHENSIVE ZONING ORDINANCE, AND ALL OTHER CITY ORDINANCES.