Notes:
8/9/2018 1:45:28 PM
001. COMPLIANCE WITH THE AMENDED ZONING ORDINANCE (13-06-36) AND ALL DEED RESTRICTIONS SHOWN ON THE FINAL PLAT (DRIVEWAY; FENCE).
002. COMPLIANCE WITH THE 2015 BUILDING CODES, LOCAL AMENDMENTS, PD AND FINAL PLAT REQUIREMENTS.
003. TERMITE BARRIER PROTECTION REQ'D AT ALL SLAB PENETRATIONS.
016. BEAMS=10"W X 30"D.
024. INCLUDED IN THIS PERMIT PACK IS THE REQUIRED BARRIER-FREE RAMP; USE THE APPROPRIATE DETAIL FIGURE 1 OR 1a.
043. TEMPERED GLASS REQUIRED AT ALL BATHROOM HAZARD LOCATIONS, INCLUDING WINDOWS AND PARTITIONS IF GLAZING IS LESS THAN 60" ABOVE ANY STANDING/WALKING SURFACE.
053. ONLY THE EOR STRUCTURE FRAME AND DETAILS ARE INCLUDED AS PART OF THIS ISSUED BUILDING PERMIT.
058. GREEN BUILDING VENTILATION REQUIREMENT BASED ON ASHARAE 62.2 STANDARD.
060. THIS SUBDIVISION MAY REQUIRE H.O.A. DESIGN APPROVAL PRIOR TO PERMIT AND CONSTRUCTION.
061. SEE ENCLOSED SHEET FOR WOOD FENCE CONSTRUCTION AND (OR) ORNAMENTAL IRON AS PER PD REQUIREMENT.