Permit Info
Short Description:
216 SQ FT, SALT / PATIO COVER
Expiration Date:
2/4/2019
Notes:
8/7/2018 2:39:38 PM
112. PATIO COVER
113. ALL WORK PERFORMED MUST MEET THE 2015 IRC STANDARDS AND ABIDE BY THE CITY OF FRISCO COMPREHENSIVE ZONING ORDINANCE AND ALL OTHER CITY ORDINANCES
114. NEED A FLATWORK INSPECTION BEFORE THE POUR
115. MAY NOT ADVERSELY AFFECT DRAINAGE OF NEIGHBORING PROPERTIES
116. DOUBLE UNDERLAYMENT REQUIRED ON COMPOSITION ROOFS WITH A 4:12 PITCH ROOF OR LESS. MINIMUM 2:12 PITCH FOR COMPOSITION SHINGLES
117. OUTSIDE OF POST CAN NOT ENCROACH THE REAR YARD SETBACK, UP TO THREE FOOT OVER-HANG IS ALLOWED
120. FIREPLACE, FIRE PIT, OUTDOOR KITCHEN (BBQ GRILL, SINK, ETC) NOT REQUESTED OR PERMITTED
121. LAG BOLT MUST PENETRATE MAIN HOUSE STUD MIN 1 "
122. MAY NOT INTRUDE ON SIDE YARD SETBACKS
123. SUBJECT TO FIELD INSPECTION APPROVAL. CALL (972) 292-5386 FOR INSPECTION
124. CITY OF FRISCO APPROVAL IS NOT IN LIEU OF HOMEOWNER ASSOCIATION (HOA) REQUIREMENTS. REFERENCE HOA BYLAWS FOR SUBDIVISION REQUIREMENTS
8/21/2018 1:18:51 PM
***ELECTRICAL WORK CANCELLED.***
Parcel Info
City/State/Zip:
FRISCO, TX,
Subdivision:
FAIRFIELD ESTATES I
|
| APPLICANT | TEXAS BEST STAIN | (972)881-4242 | ROCKY@texasbeststain.com | | PLANO, TX 75075 |
| OWNER | LARKIN JENNIFER | (972)971-8908 | jlynn8104@yahoo.com | | FRISCO, TX 75035-6383 |
| CONTRACTOR | TEXAS BEST STAIN | (972)881-4242 | ROCKY@texasbeststain.com | | PLANO, TX 75075 |
| ELECT. CTR. | NEW WORLD ELECTRIC | (469)288-3755 | ray@newworldelectric.net | | FLOWER MOUND, TX 75028 |
|
| RESIDENTIAL BUILDING PERMIT FEE |
$167.25
|
8/8/2018
|
| RESIDENTIAL FEE |
$30.00
|
8/8/2018
|
| Total Fees |
|
Charged: $197.25
Balance Due: $0.00
|
There are currently no inspections on this record.
|
| INITIAL REVIEW | TREB DUMA | ACCEPTED | 7/30/2018 | 7/31/2018 | |
More Info
|
| ADDITION AND ALTERATION | CRYSTAL FAUSS | DENIED | 7/31/2018 | 8/6/2018 | |
More Info
|
| ADDITION AND ALTERATION | CRYSTAL FAUSS | APPROVED AS NOTED | 8/7/2018 | 8/7/2018 | |
More Info
|
| MISC REVIEW | TREB DUMA | APPROVED AS NOTED | 8/21/2018 | 8/21/2018 | |
More Info
|