Notes:
7/10/2018 1:25:36 PM
ROOF
* ALL WORK PERFORMED MUST MEET THE 2015 IRC STANDARDS AND ABIDE BY THE CITY OF FRISCO COMPREHENSIVE ZONING ORDINANCE, AND ALL OTHER CITY ORDIANCES.
SUBJECT TO FIELD INSPECTION APPROVAL.
* STRUCTURAL OR MECHANICAL ELEMENTS SHALL NOT BE VISIBLE FROM SIX FEET ABOVE THE GRADE OF ADJACENT STREET.
MAY NOT PROJECT ABOVE THE HIGHEST POINT OF THE BUILDING.
*REROOFING: MUST COMPLY WITH SECTION R908 OF THE 2015 (IRC) INTERNATIONAL RESIDENTIAL CODE
CITY OF FRISCO ORDINANCE NO. 17-05-38 TABLE R301.2 (1) CLIMATIC AND GEOGRAPHIC DESIGN CRITERIA: ICE BARRIER UNDERLAYMENT IS NOT REQUIRED.
R908.5 REINSTALLATION OF MATERIALS: EXISTING SLATE, CLAY OR CEMENT TILE SHALL BE PERMITTED FOR REINSTALLATION, EXCEPT THAT DAMAGED, CRACKED OR BROKEN SLATE OR TILE SHALL NOT BE REINSTALLED. ANY EXISTING FLASHINGS, EDGINGS, OUTLETS, VENTS OR SIMILAR DEVICES THAT ARE A PART OF THE ASSEMBLY SHALL BE REPLACED WHERE RUSTED, DAMAGED OR DETERIORATED. AGGREGATE SURFACING MATERIALS SHALL NOT BE REINSTALLED.
R908.4 *WHERE THE APPLICATION OF A NEW ROOF COVERING OVER WOOD SHINGLE OR SHAKE ROOFS CREATES A COMBUSTIBLE CONCEALED SPACE, THE ENTIRE EXISTING SURFACE SHALL BE COVERED WITH GYPSUM BOARD, MINERAL FIBER-GLASS FIBER OR OTHER APPROVED MATERIALS SECURELY FASTENED IN PLACE.
*SUBJECT TO FIELD INSPECTION APPROVAL, CALL (972) 292-5386 FOR INSPECTIONS.*