Notes:
7/20/2018 4:06:13 PM
001. COMPLIANCE WITH THE AMENDED ZONING ORDINANCE (13-06-36) AND ALL DEED RESTRICTIONS SHOWN ON THE FINAL PLAT (DRIVEWAY; FENCE).
002. COMPLIANCE WITH THE 2015 BUILDING CODES, LOCAL AMENDMENTS, PD AND FINAL PLAT REQUIREMENTS.
003. TERMITE BARRIER PROTECTION REQ'D AT ALL SLAB PENETRATIONS.
007. MAX SIDEWALK SLOPE IS 8.3%, ADD STEPS AS REQ'D.
017. BEAMS=10"W X 32"D.
023. FRONT ENTRY CURB CUT PER ENCLOSED DESIGN SKETCH WITH DRIVEWAY MAXIMUM WIDTH 24 FEET.
042. TEMPERED GLASS REQUIRED AT WINDOWS AND PARTITIONS WITHIN 2' OF DOOR OPENINGS.
043. TEMPERED GLASS REQUIRED AT ALL BATHROOM HAZARD LOCATIONS, INCLUDING WINDOWS AND PARTITIONS IF GLAZING IS LESS THAN 60" ABOVE ANY STANDING/WALKING SURFACE.
047. 2 X 6 PLUMBING (VENT STACK/WASTE) WALLS REQ'D AT ALL FIXTURES.
048. MEDIA ROOM WITH CLOTHING STORAGE MUST HAVE A CODE COMPLIANT EGRESS WINDOW.
053. ONLY THE EOR STRUCTURE FRAME AND DETAILS ARE INCLUDED AS PART OF THIS ISSUED BUILDING PERMIT.
058. GREEN BUILDING VENTILATION REQUIREMENT BASED ON ASHARAE 62.2 STANDARD.
059. DRIVEWAY, LEADWALK AND GARAGE DOOR ENHANCEMENTAND TREATMENT PER THE ENCLOSED
060. THIS SUBDIVISION MAY REQUIRE H.O.A. DESIGN APPROVAL PRIOR TO PERMIT AND CONSTRUCTION.
061. SEE ENCLOSED SHEET FOR WOOD FENCE CONSTRUCTION AND (OR) ORNAMENTAL IRON AS PER PD REQUIREMENT.