Notes:
6/12/2018 3:06:44 PM
112. PATIO COVER
113. ALL WORK PERFORMED MUST MEET THE 2015 IRC STANDARDS AND ABIDE BY THE CITY OF FRISCO COMPREHENSIVE ZONING ORDINANCE AND ALL OTHER CITY ORDINANCES
115. MAY NOT ADVERSELY AFFECT DRAINAGE OF NEIGHBORING PROPERTIES
114. NEED A FLATWORK INSPECTION BEFORE THE POUR
116. DOUBLE UNDERLAYMENT REQUIRED ON COMPOSITION ROOFS WITH A 4:12 PITCH ROOF OR LESS. MINIMUM 2:12 PITCH FOR COMPOSITION SHINGLES
117. OUTSIDE OF POST CAN NOT ENCROACH THE REAR YARD SETBACK, UP TO THREE FOOT OVER-HANG IS ALLOWED
118. CAN ENCROACH REAR BUILD LINE IF 10 FEET AWAY FROM THE MAIN STRUCTURE
119. NO PLUMBING PERMIT REQUESTED OR ISSUED
120. FIREPLACE, FIRE PIT, OUTDOOR KITCHEN (BBQ GRILL, SINK, ETC) NOT REQUESTED OR PERMITTED
121. LAG BOLT MUST PENETRATE MAIN HOUSE STUD MIN 1 "
122. MAY NOT INTRUDE ON SIDE YARD SETBACKS
123. SUBJECT TO FIELD INSPECTION APPROVAL. CALL (972) 292-5386 FOR INSPECTION
124. CITY OF FRISCO APPROVAL IS NOT IN LIEU OF HOMEOWNER ASSOCIATION (HOA) REQUIREMENTS. REFERENCE HOA BYLAWS FOR SUBDIVISION REQUIREMENTS