Notes:
5/2/2018 8:17:23 AM
001. COMPLIANCE WITH THE AMENDED ZONING ORDINANCE (13-06-36) AND ALL DEED RESTRICTIONS SHOWN ON THE FINAL PLAT (DRIVEWAY; FENCE).
002. COMPLIANCE WITH THE 2015 BUILDING CODES, LOCAL AMENDMENTS, PD AND FINAL PLAT REQUIREMENTS.
003. TERMITE BARRIER PROTECTION REQ'D AT ALL SLAB PENETRATIONS.
007. MAX SIDEWALK SLOPE IS 8.3%, ADD STEPS AS REQ'D.
016. BEAMS=10"W X 30"D.
023. FRONT ENTRY CURB CUT PER ENCLOSED DESIGN SKETCH WITH DRIVEWAY MAXIMUM WIDTH 24 FEET.
032. ALL SIDING, TRIM, SHAKES AND SIMILAR NON-MASONRY EXTERIOR SURFACE COVERINGS MUST BE OF CEMENTITIOUS MATERIAL; (OR) ENGINEERED/TREATED WOOD PRODUCT.
042. TEMPERED GLASS REQ'D AT WINDOWS AND PARTITIONS WITHIN 2' OF DOOR OPENINGS.
043. TEMPERED GLASS REQ'D AT ALL BATHROOM HAZARD LOCATIONS, INCLUDING WINDOWS AND PARTITIONS IF GLAZING IS LESS THAN 60" ABOVE ANY STANDING/WALKING SURFACE.
044. TEMPERED GLASS AT FLOAT GLASS WINDOWS GREATER THAN 9 SQ FT, LESS THAN 18" OFF FINISH FLOOR, WITHIN 3'-0" OF A WALKING SURFACE.
047. 2 X 6 PLUMBING (VENT STACK/WASTE) WALLS REQ'D AT ALL FIXTURES.
051. CO DETECTORS REQ'D ON ELECTRICAL LEGEND \u0026 ELECTRICAL PLAN. (1) PER FLOOR MINIMUM WITH (1) ON THE AC SIDE OF THE GARAGE DOOR AND OUTSIDE THE VICINITY OF EACH BEDROOM.
053. ONLY THE EOR STRUCTURE FRAME AND DETAILS ARE INCLUDED AS PART OF THIS ISSUED BUILDING PERMIT.
054. LETTERS OF ACCEPTANCE FOR FOUNDATION \u0026 FRAME REQUIRED FROM BOTH ENGINEERS FOR CO.
058. GREEN BUILDING VENTILATION REQUIREMENT BASED ON ASHARAE 62.2 STANDARD.
060. THIS SUBDIVISION MAY REQUIRE H.O.A. DESIGN APPROVAL PRIOR TO PERMIT AND CONSTRUCTION.
061. SEE ENCLOSED SHEET FOR WOOD FENCE CONSTRUCTION AND (OR) ORNAMENTAL IRON AS PER PD REQUIREMENT.