Notes:
4/9/2018 10:24:17 AM
001. COMPLIANCE WITH THE AMENDED ZONING ORDINANCE (13-06-36) AND ALL DEED RESTRICTIONS SHOWN ON THE FINAL PLAT (DRIVEWAY; FENCE).
002. COMPLIANCE WITH THE 2015 BUILDING CODES, LOCAL AMENDMENTS, PD AND FINAL PLAT REQUIREMENTS.
003. TERMITE BARRIER PROTECTION REQ'D AT ALL SLAB PENETRATIONS.
004. DRIVEWAY SLOPE MUST NOT EXCEED 12%; PLOT PLANS WITH SPOT GRADES ARE REQUIRED.
006. MAX STRUCTURE HEIGHT FROM AVG FINISH GRADE 40'-0".
029. PROVIDE EXPANSION JOINTS IN MASONARY FACADE.
031. SIDING DIRECTLY OVER MASONRY AT SECOND STORY IS NOT ALLOWED.
047. 2 X 6 PLUMBING (VENT STACK/WASTE) WALLS REQ'D AT ALL FIXTURES.
050. DOUBLE UNDERLAYMENT REQUIRED ON COMPOSITION ROOFS WITH A 4:12 PITCH OR LESS
060. THIS SUBDIVISION MAY REQUIRE H.O.A. DESIGN APPROVAL PRIOR TO PERMIT AND CONSTRUCTION.