Notes:
12/15/2017 11:57:41 AM
001. COMPLIANCE WITH THE AMENDED ZONING ORDINANCE (13-06-36) AND ALL DEED RESTRICTIONS SHOWN ON THE FINAL PLAT (DRIVEWAY; FENCE).
002. COMPLIANCE WITH THE 2015 BUILDING CODES, LOCAL AMENDMENTS, PD AND FINAL PLAT REQUIREMENTS.
003. TERMITE BARRIER PROTECTION REQ'D AT ALL SLAB PENETRATIONS.
007. MAX SIDEWALK SLOPE IS 8.3%, ADD STEPS AS REQ'D.
014. BEAMS=10"W X 28"D.
023. FRONT ENTRY CURB CUT PER ENCLOSED DESIGN SKETCH WITH DRIVEWAY MAXIMUM WIDTH 24 FEET.
029. PROVIDE EXPANSION JOINTS IN MASONARY FACADE.
037. ATTIC STORAGE MUST NOT BE CONVERTED TO HABITABLE LIVING AREA WITHOUT A BUILDING PERMIT
042. TEMPERED GLASS REQ'D AT WINDOWS AND PARTITIONS WITHIN 2' OF DOOR OPENINGS.
043. TEMPERED GLASS REQ'D AT ALL BATHROOM HAZARD LOCATIONS, INCLUDING WINDOWS AND PARTITIONS IF GLAZING IS LESS THAN 60" ABOVE ANY STANDING/WALKING SURFACE.
044. TEMPERED GLASS AT FLOAT GLASS WINDOWS GREATER THAN 9 SQ FT, LESS THAN 18" OFF FINISH FLOOR, WITHIN 3'-0" OF A WALKING SURFACE.
053. ONLY THE EOR STRUCTURE FRAME AND DETAILS ARE INCLUDED AS PART OF THIS ISSUED BUILDING PERMIT.
054. LETTERS OF ACCEPTANCE FOR FOUNDATION & FRAME REQUIRED FROM BOTH ENGINEERS FOR CO.
055. WRITTEN COMPLIANCE WITH E.O.R. FOUNDATION DESIGN NOTE(S) REQ'D BY BUILDER PRIOR TO THE START OF CONSTRUCTION. COPY SAME TO THE CITY OF FRISCO IN THE PERMIT POUCH.
057. VENDOR JOIST (TJI) MUST INCLUDE LIVE & DEAD LOAD CAPACITY PER E.O.Rs SEALED DESIGN APPROVAL.
**** 2ND STORY - GR, 3BR & 3BA ****