Notes:
SALT / REROOF
7/31/2017 12:00:00 AM
* ALL WORK PERFORMED MUST MEET THE 2015 IRC, IBC & IPMC STANDARDS AND ABIDE BY THE CITY OF FRISCO COMPREHENSIVE ZONING ORDINANCE, AND ALL OTHER CITY ORDIANCES.
* STRUCTURAL OR MECHANICAL ELEMENTS SHALL NOT BE VISIBLE FROM SIX FEET ABOVE THE GRADE OF ADJACENT STREET & MAY NOT PROJECT ABOVE THE HIGHEST POINT OF THE BUILDING.*
*REROOFING MATERIAL APPLICATION SHALL COMPLY WITH THE SECTION R905.1 THROUGH R09.16 & SECTION R908, AS APPLICABLE, OF THE 2015 IRC.
*WHERE THE APPLICATION OF A NEW ROOF COVERING OVER WOOD SHINGLE OR SHAKE ROOFS CREATES A COMBUSTIBLE CONCEALED SPACE, THE ENTIRE EXISTING SURFACE SHALL BE COVERED WITH GYPSUM BOARD, MINERAL FIBER-GLASS FIBER OR OTHER APPROVED MATERIALS SECURELY FASTENED IN PLACE.
*SUBJECT TO FIELD INSPECTION APPROVAL, CALL (972) 292-5386 FOR INSPECTIONS.*