Notes:
688 SQ FT, SALT / PATIO COVER, CONCRETE EXTENSION & GRILL
7/29/2017 12:00:00 AM
142. * ALL WORK PERFORMED MUST MEET THE 2015 IRC STANDARDS AND ABIDE BY THE CITY OF FRISCO COMPREHENSIVE ZONING ORDINANCE, AND ALL OTHER CITY ORDINANCES.
050. DOUBLE UNDERLAYMENT REQUIRED ON COMPOSITION ROOFS WITH A 4:12 PITCH ROOF OR LESS. MINIMUM 2/12 PITCH FOR COMPOSITION SHINGLES
145. * OUTSIDE OF POST CAN NOT ENCROACH THE REAR YARD SETBACK, UP TO THREE FOOT OVER-HANG IS ALLOWED. CAN ENCROACH REAR BUILD LINE IF 10 FEET AWAY FROM THE MAIN STRUCTURE.
146. *** NO PLUMBING PERMIT REQUESTED OR ISSUED ***
147. *** FIREPLACE, FIRE-PIT & SINK NOT REQUESTED OR PERMITTED. ***
148. ***LAG BOLT MUST PENETRATE MAIN HOUSE STUD MIN 1 ½".
151. ***MAY NOT INTRUDE ON SIDE YARD SETBACKS.
166. ACCEPTABLE FIRE EXTINGUISHING DEVICE MUST BE READILY ACCESSIBLE.
167. FIRE PITS SHALL HAVE A MINIMUM DISTANCE OF FIFTEEN FEET (15') FROM THE MAIN STRUCTURE AND TEN FEET (10') FROM ANY COMBUSTIBLE ITEM.
**ALL FIRE FEATURES TO BE CONSIDERED AS APPLIANCES SHALL BE TESTED AND LISTED BY A NRTL AS COMPLIANT WITH ANZI Z21.42 OR Z21.97, OTHERWISE THEY SHALL BE CONSIDERED AS OPEN BURNING FIRE PITS AND SUBJECT TO THE SETBACK REQUIREMENT OF THE INTERNATIONAL FIRE CODE AND COMPREHENSIVE ZONING ORDINANCE.
143. SUBJECT TO FIELD INSPECTION APPROVAL. CALL (972) 292-5386 FOR INSPECTION.
153. CITY OF FRISCO APPROVAL IS NOT IN LIEU OF HOMEOWNER ASSOCIATION (HOA) REQUIREMENTS. REFERENCE HOA BYLAWS FOR SUBDIVISION REQUIREMENTS.