Notes:
236 SQ FT, SALT / MASTER REMODEL
5/11/2017 12:00:00 AM
BATH ROOM AND CLOSET ADDITION:
142. * ALL WORK PERFORMED MUST MEET THE 2015 IRC STANDARDS AND ABIDE BY THE CITY OF FRISCO COMPREHENSIVE ZONING ORDINANCE, AND ALL OTHER CITY ORDINANCES.
FIRST FLOOR ELEVATION 100% MASONRY REQUIRED
ELECTRICAL
* ALL WORK PERFORMED MUST MEET THE 2014 NEC AND 2015 IRC STANDARDS AND ABIDE BY THE CITY OF FRISCO COMPREHENSIVE ZONING ORDINANCE, AND ALL OTHER CITY ORDIANCES.
01. MINIMUM #12 COPPER CONDUCTORS PERMITTED EXCEPT FOR CONTROLS.
02. NO ALUMINIM WIRE PERMITTED OR #14
IEC3 ENERGY REQUIREMENT REQUIRED FOR ADDITIONS
054. ENGINEERS LETTERS OF ACCEPTANCE FOR FRAMING AND FOUNDITION REQUIRED PRIOR TO THE CITY OF FRISCO FRAME INSPECTION.
PLUMBING
* ALL WORK PERFORMED MUST MEET THE 2015 IRC AND 2015 IMC STANDARDS AND ABIDE BY THE CITY OF FRISCO COMPREHENSIVE ZONING ORDINANCE, AND ALL OTHER CITY ORDINANCES.
**COMPRESSION TYPE MECHANICAL JOINTS ARE NOT PERMITTED UNDERGROUND**
193. SUBJECT TO FIELD INSPECTION APPROVAL. CALL (972) 292-5386 FOR INSPECTION.
153. CITY OF FRISCO APPROVAL IS NOT IN LIEU OF HOMEOWNER ASSOCIATION (HOA) REQUIREMENTS. REFERENCE HOA BYLAWS FOR SUBDIVISION REQUIREMENTS.