Notes:
CALT, REROOF / KOHL'S DEPARTMENT STORE
3/24/2017 12:00:00 AM
PENDING REGISTRATION FEE
(2/9/2017 8:42 AM TD)
We will be removing the ballasted rock off of the TPO roofing membrane, then removing the TPO off of the roof, then we are leaving the existing insulation on the roof but added another layer of (R-1.5) and then attaching a new TPO membrane on top of that.
REROOF
* ALL WORK PERFORMED MUST MEET THE 2015 IBC STANDARDS AND ABIDE BY THE CITY OF FRISCO COMPREHENSIVE ZONING ORDINANCE, AND ALL OTHER CITY ORDIANCES.
SUBJECT TO FIELD INSPECTION APPROVAL.
* STRUCTURAL OR MECHANICAL ELEMENTS SHALL NOT BE VISIBLE FROM SIX FEET ABOVE THE GRADE OF ADJACENT STREET.
MAY NOT PROJECT ABOVE THE HIGHEST POINT OF THE BUILDING.
*WHERE THE APPLICATION OF A NEW ROOF COVERING OVER WOOD SHINGLE OR SHAKE ROOFS CREATES A COMBUSTIBLE CONCEALED SPACE, THE ENTIRE EXISTING SURFACE SHALL BE COVERED WITH GYPSUM BOARD, MINERAL FIBER-GLASS FIBER OR OTHER APPROVED MATERIALS SECURELY FASTENED IN PLACE.
CALL (972) 292-5386 FOR INSPECTION.