Notes:
3304 AC, 4387 SF, SFR / 1 STORY
2/28/2017 12:00:00 AM
001. COMPLIANCE WITH THE AMENDED ZONING ORDINANCE (13-06-36) AND ALL DEED RESTRICTIONS SHOWN ON THE FINAL PLAT (DRIVEWAY; FENCE).
002. COMPLIANCE WITH THE 2015 BUILDING CODES, LOCAL AMENDMENTS, PD AND FINAL PLAT REQUIREMENTS.
003. TERMITE BARRIER PROTECTION REQ'D AT ALL SLAB PENETRATIONS.
020. BEAMS=12"W X 26"D.
025. GARAGE MUST BE A MIN. 18'W X 20'D CLEAR SHEET ROCK TO SHEET ROCK.
029. PROVIDE EXPANSION JOINTS IN MASONARY FACADE.
032. ALL SIDING, TRIM, SHAKES AND SIMILAR NON-MASONRY EXTERIOR SURFACE COVERINGS MUST BE OF CEMENTITIOUS MATERIAL; (OR) ENGINEERED/TREATED WOOD PRODUCT.
034. RESIDENTIAL STUCCO REQUIRES LATH & EXPANDED WIRE MESH WITH CEMENT PLASTER.
042. TEMPERED GLASS REQ'D AT WINDOWS AND PARTITIONS WITHIN 2' OF DOOR OPENINGS.
043. TEMPERED GLASS REQ'D AT ALL BATHROOM HAZARD LOCATIONS, INCLUDING WINDOWS AND PARTITIONS IF GLAZING IS LESS THAN 60" ABOVE ANY STANDING/WALKING SURFACE.
044. TEMPERED GLASS AT FLOAT GLASS WINDOWS GREATER THAN 9 SQ FT, LESS THAN 18" OFF FINISH FLOOR, WITHIN 3'-0" OF A WALKING SURFACE.
050. DOUBLE UNDERLAYMENT REQUIRED ON COMPOSITION ROOFS WITH A 4:12 PITCH OR LESS
054. LETTERS OF ACCEPTANCE FOR FOUNDATION & FRAME REQUIRED FROM BOTH ENGINEERS FOR CO.
058. GREEN BUILDING VENTILATION REQUIREMENT BASED ON ASHARAE 62.2 STANDARD.
059. DRIVEWAY, LEADWALK & GARAGE DOOR ENHANCEMENT & TREATMENT PER THE ENCLOSED
060. THIS SUBDIVISION MAY REQUIRE H.O.A. DESIGN APPROVAL PRIOR TO PERMIT AND CONSTRUCTION.
061. SEE ENCLOSED SHEET FOR WOOD FENCE CONSTRUCTION AND (OR) ORNAMENTAL IRON AS PER PD REQUIREMENT.
(2/28/2017 1:09 PM JC)
(FWF)