Notes:
256 SQ FT, SALT / PATIO COVER
12/5/2016 12:00:00 AM
PATIO COVER
105. *** NEED A FLATWORK INSPECTION BEFORE THE POUR. ***
**MAY NOT ADVERSELY AFFECT DRAINAGE OF NEIGHBORING PROPERTIES**
142. * ALL WORK PERFORMED MUST MEET THE 2012 IRC STANDARDS AND ABIDE BY THE CITY OF FRISCO COMPREHENSIVE ZONING ORDINANCE, AND ALL OTHER CITY ORDINANCES.
050. DOUBLE UNDERLAYMENT REQUIRED ON COMPOSITION ROOFS WITH A 4:12 PITCH ROOF OR LESS.
145. * OUTSIDE OF POST CAN NOT ENCROACH THE 20' REAR YARD SETBACK, UP TO THREE FOOT OVER-HANG IS ALLOWED.
146. *** NO PLUMBING PERMIT REQUESTED OR ISSUED ***
147. *** FIREPLACE, FIRE PIT, OUTDOOR KITCHEN (BBQ GRILL, SINK, ETC) NOT REQUESTED OR PERMITTED. ***
148. ***LAG BOLT MUST PENETRATE MAIN HOUSE STUD MIN 1 ½".
151. ***MAY NOT INTRUDE ON SIDE YARD SETBACKS.
143. SUBJECT TO FIELD INSPECTION APPROVAL. CALL (972) 292-5386 FOR INSPECTION.
153. CITY OF FRISCO APPROVAL IS NOT IN LIEU OF HOMEOWNER ASSOCIATION (HOA) REQUIREMENTS. REFERENCE HOA BYLAWS FOR SUBDIVISION REQUIREMENTS.