Notes:
525 SQ FT, SALT / SOLAR SYSTEM
9/6/2016 12:00:00 AM
1. Conductors smaller than #12 awg not permitted.
2. No aluminum conductors permitted.
3. PV installations shall comply with article 690, 2011 National Electrical Code.
4. All installations are subject to field inspection and approval.
(9/6/2016 3:32 PM HC)
1. Conductors smaller than #12 awg not permitted.
2. No aluminum conductors permitted.
3. PV installations shall comply with article 690, 2011 National Electrical Code.
4. All installations are subject to field inspection and approval.
03. PULL EQUIPMENT GROUNDS IN ALL RACEWAYS.
ALL ELECTRICAL INSTALLATIONS WILL BE SUBJECT TO FIELD INSPECTIONS AND INSPECTOR APPROVALS.
ELECTRICAL WILL BE DESIGNED AND INSTALLED PER THE 2011 NATIONAL ELECTRICAL CODE WITH LOCAL AMENDMENTS STATED IN CITY OF FRISCO ORDINANCE 13-10-67 ALONG WITH THE FOLLOWING COMMENTS.
102. * ALL WORK PERFORMED MUST MEET THE 2012 IRC STANDARDS AND ABIDE BY THE CITY OF FRISCO COMPREHENSIVE ZONING ORDINANCE, AND ALL OTHER CITY ORDINANCES.
153. CITY OF FRISCO APPROVAL IS NOT IN LIEU OF HOMEOWNER ASSOCIATION (HOA) REQUIREMENTS. REFERENCE HOA BYLAWS FOR SUBDIVISION REQUIREMENTS.
163. SUBJECT TO FIELD INSPECTION APPROVAL. CALL (972) 292-5386 FOR INSPECTION.