Notes:
SALT / INTERIOR BR/BATH ALTERATIONS
6/7/2016 12:00:00 AM
REMOVE INTERIOR WALL TO CREATE NEW MASTER SUITE.
ADD BEARING SUPPORT TO TRANSFER ROOF LOADS TO FOUNDATION AS NEEDED.
ALTERATIONS EXISTING BATH INCLUDE REMOVING TUB AND VANITIES AND ADD SHOWER.
SMOKE DETECTOR REQUIRED IN NEW BR.