Notes:
*MODEL* 3388 AC, 4178 SF, SFR / 2 STORY
7/6/2016 12:00:00 AM
001. COMPLIANCE WITH THE AMENDED ZONING ORDINANCE (06/18/13) AND ALL DEED RESTRICTIONS SHOWN ON THE FINAL PLAT (DRIVEWAY; FENCE).
002. COMPLIANCE WITH THE 2012 BUILDING CODES, LOCAL AMENDMENTS, PD AND FINAL PLAT REQUIREMENTS.
003. TERMITE BARRIER PROTECTION REQ'D AT ALL SLAB PENETRATIONS.
007. MAX SIDEWALK SLOPE IS 8.3%, ADD STEPS AS REQ'D.
017. BEAMS=10"W X 32"D.
023. FRONT ENTRY CURB CUT PER ENCLOSED DESIGN SKETCH WITH DRIVEWAY MAXIMUM WIDTH 24 FEET.
025. GARAGE MUST BE A MIN. 18'W X 20'D CLEAR SHEET ROCK TO SHEET ROCK.
030. SECOND FLOOR SIDING AREA MUST NOT EXCEED 50% OF THE TOTAL NET EXPOSED WALL AREA.
034. RESIDENTIAL STUCCO REQUIRES LATH & EXPANDED WIRE MESH WITH CEMENT PLASTER.
042. TEMPERED GLASS REQ'D AT WINDOWS AND PARTITIONS WITHIN 2' OF DOOR OPENINGS.
043. TEMPERED GLASS REQ'D AT ALL BATHROOM HAZARD LOCATIONS, INCLUDING WINDOWS AND PARTITIONS IF GLAZING IS LESS THAN 60" ABOVE ANY STANDING/WALKING SURFACE.
047. 2 X 6 PLUMBING (VENT STACK/WASTE) WALLS REQ'D AT ALL FIXTURES.
048. MEDIA ROOM WITH CLOTHING STORAGE MUST HAVE A CODE COMPLIANT EGRESS WINDOW.
053. ONLY THE EOR STRUCTURE FRAME AND DETAILS ARE INCLUDED AS PART OF THIS ISSUED BUILDING PERMIT.
058. GREEN BUILDING VENTILATION REQUIREMENT BASED ON ASHARAE 62.2 STANDARD.
059. DRIVEWAY, LEADWALK & GARAGE DOOR ENHANCEMENT & TREATMENT PER THE ENCLOSED
060. THIS SUBDIVISION MAY REQUIRE H.O.A. DESIGN APPROVAL PRIOR TO PERMIT AND CONSTRUCTION.
061. SEE ENCLOSED SHEET FOR WOOD FENCE CONSTRUCTION AND (OR) ORNAMENTAL IRON AS PER PD REQUIREMENT.
(7/6/2016 10:29 AM JC)
2nd. story w/ game room & full bath.