Notes:
SALT / SOLATUBE INSTALLATIONS
5/5/2016 12:00:00 AM
SCREENED PATIO
142. * ALL WORK PERFORMED MUST MEET THE 2012 IRC STANDARDS AND ABIDE BY THE CITY OF FRISCO COMPREHENSIVE ZONING ORDINANCE, AND ALL OTHER CITY ORDINANCES.
050. DOUBLE UNDERLAYMENT REQUIRED ON COMPOSITION ROOFS WITH A 4:12 PITCH ROOF OR LESS.
143. SUBJECT TO FIELD INSPECTION APPROVAL. CALL (972) 292-5386 FOR INSPEC150. ALL FACADES (EXTERIOR) MATERIALS MUST REFLECT EARLY 20TH CENTURY TEXAS ARCHITECTURAL STYLES SAME AS THE EXISTING STRUCTURE.
145. * OUTSIDE OF POST CAN NOT ENCROACH THE 10' REAR YARD SETBACK, UP TO THREE FOOT OVER-HANG IS ALLOWED.
146. *** NO ELECTRICAL OR PLUMBING PERMIT REQUESTED OR ISSUED ***
147. *** FIREPLACE, FIRE PIT, OUTDOOR KITCHEN (BBQ GRILL, SINK, ETC) NOT REQUESTED OR PERMITTED. ***
148. ***LAG BOLT MUST PENETRATE MAIN HOUSE STUD MIN 1 ½".
151. ***MAY NOT INTRUDE ON SIDE YARD SETBACKS.
153. CITY OF FRISCO APPROVAL IS NOT IN LIEU OF HOMEOWNER ASSOCIATION (HOA) REQUIREMENTS. REFERENCE HOA BYLAWS FOR SUBDIVISION REQUIREMENTS.