Notes:
5 SQ FT, SALT / GAS FIREPLACE
3/2/2016 12:00:00 AM
172. * ALL WORK PERFORMED MUST MEET THE 2012 IRC STANDARDS.
175. * FIREPLACE MUST BE 100% MASONRY.
176. * VENTING AND FLUE MUST MEET MANUFACTURERS SPECIFICATIONS.
177. * MUST MAINTAIN TEN FOOT CLEARANCE FROM ALL COMBUSTABLE ITEMS.
178. * CHIMNEY MUST MAINTAIN A MINIMUM OF 2' IN CLEARANCE (EXCLUDING SPARK ARRESTOR) IN HEIGHT WITHIN A 10' RADIUS OF CHIMNEY.
179. * FOOTER THICKNESS 12" MIN & WIDTH 6" EACH SIDE OF FIREPLACE WALL.
*100% MASONRY STRUCTURE, NO GREATER THAN 8 FT MAY ENCROACH INTO THE REAR YARD UP TO 10 FT FROM PROPERTY LINE.*
** A GASLINE PRESSURE TEST IS REQUIRED WHEN ADDING GAS TO AN OUTDOOR FIREPLACE **
173. SUBJECT TO FIELD INSPECTION APPROVAL. CALL (972) 292-5386 FOR INSPECTION.
153. CITY OF FRISCO APPROVAL IS NOT IN LIEU OF HOMEOWNER ASSOCIATION (HOA) REQUIREMENTS. REFERENCE HOA BYLAWS FOR SUBDIVISION REQUIREMENTS.