Notes:
360 SQ FT, SALT / PATIO COVER, GRILL AREA & CONCRETE
2/15/2016 12:00:00 AM
142. * ALL WORK PERFORMED MUST MEET THE 2012 IRC STANDARDS AND ABIDE BY THE CITY OF FRISCO COMPREHENSIVE ZONING ORDINANCE, AND ALL OTHER CITY ORDINANCES.
105. *** NEED A FLATWORK INSPECTION BEFORE THE POUR. ***
050. DOUBLE UNDERLAYMENT REQUIRED ON COMPOSITION ROOFS WITH A 4:12 PITCH ROOF OR LESS.
145. * OUTSIDE OF POST CAN NOT ENCROACH THE 20' REAR YARD SETBACK, UP TO THREE FOOT OVER-HANG IS ALLOWED.
146. *** NO ELECTRICAL OR PLUMBING PERMIT REQUESTED OR ISSUED ***
147. *** FIREPLACE, FIRE PIT & SINK NOT REQUESTED OR PERMITTED. ***
148. ***LAG BOLT MUST PENETRATE MAIN HOUSE STUD MIN 1 ½".
151. ***MAY NOT INTRUDE ON SIDE YARD SETBACKS.
**A GAS LINE PRESSURE TEST IS REQUIRED WHEN ADDING GAS TO AN OUTDOOR
APPLIANCE**
143. SUBJECT TO FIELD INSPECTION APPROVAL. CALL (972) 292-5386 FOR INSPECTION.
153. CITY OF FRISCO APPROVAL IS NOT IN LIEU OF HOMEOWNER ASSOCIATION (HOA) REQUIREMENTS. REFERENCE HOA BYLAWS FOR SUBDIVISION REQUIREMENTS.