Notes:
736 SQ FT, SALT / PATIO COVER, CONCRETE AND OUTDOOR KITCHEN
1/27/2016 12:00:00 AM
142. * ALL WORK PERFORMED MUST MEET THE 2012 IRC STANDARDS AND ABIDE BY THE CITY OF FRISCO COMPREHENSIVE ZONING ORDINANCE, AND ALL OTHER CITY ORDINANCES.
050. DOUBLE UNDERLAYMENT REQUIRED ON COMPOSITION ROOFS WITH A 4:12 PITCH ROOF OR LESS.
105. *** NEED A FLATWORK INSPECTION BEFORE THE POUR. ***
145. * OUTSIDE OF POST CAN NOT ENCROACH THE 10' REAR YARD SETBACK, UP TO THREE FOOT OVER-HANG IS ALLOWED. CAN ENCROACH REAR BUILD LINE IF 10 FEET AWAY FROM THE MAIN STRUCTURE.
147. *** FIREPLACE & SINK NOT REQUESTED OR PERMITTED. ***
148. ***LAG BOLT MUST PENETRATE MAIN HOUSE STUD MIN 1 ½".
151. ***MAY NOT INTRUDE ON SIDE YARD SETBACKS.
162. * ALL WORK PERFORMED MUST MEET THE 2012 IRC STANDARDS.
165. MAY NOT INTRUDE ON SIDE YARD SETBACKS.
A LISTED AND LABELED DEVICE FOR USE WITH GAS COMPOSED OF FACTORY-MADE COMPONENTS ASSEMBLED IN THE FIELD IN ACCORDANCE WITH THE MANUFACTURER’S INSTRUCTION AND CONDITIONS OF THE LISTING. UL LISTED ILLUMINATING APPLIANCES SHALL FOLLOW THE MANUFACTURER’S INSTALLATION INSTRUCTIONS AND REQUIRED CLEARANCES ARE DICTATED BY THE MANUFACTURE’S INSTRUCTIONS AS INDICATED BY THE LISTING AGENCY THAT TESTED THE APPLIANCE.
163. SUBJECT TO FIELD INSPECTION APPROVAL. CALL (972) 292-5386 FOR INSPECTION.
**A GAS LINE PRESSURE TEST IS REQUIRED WHEN ADDING GAS TO AN OUTDOOR
APPLIANCE**
(4/25/2016 12:22 PM TD)
ADDED FIRE TABLE, SEE ATTACHED.