Notes:
SALT / CONCRETE PATIO & CONCRETE DECK
9/4/2015 12:00:00 AM
112. * ALL WORK PERFORMED MUST MEET THE 2012 IRC STANDARDS AND ABIDE BY THE CITY OF FRISCO COMPREHENSIVE ZONING ORDINANCE.
113. SUBJECT TO FIELD INSPECTION APPROVAL. CALL (972) 292-5386 FOR INSPECTION.
115. * 5' TURNING RADIUS REQUIRED AT THE APPROACH.
116. * 8" DEPTH THE FIRST FOOT IN FROM THE LIP OF THE STREET/ALLEY.
117. * IF METER WITHIN 3' OF DRIVEWAY, NEED TO INSTALL BALLARD.
118. *** NEED A FLATWORK INSPECTION BEFORE THE POUR. ***
*DRIVEWAY MUST BE THE SAME WIDTH FROM THE PROPERTY LINE TO THE CURB CUT FLARE POINT.
*FLARE POINT TO WIDEN DRIVEWAY MUST BE AT OR BEHIND PROPERTY LINE.
*DRIVEWAY SLAB SHALL BE A MIN OF 36" FROM THE SIDE YARD PROPERTY LINE AND INCLUDE A REINFORCED CONCRETE TURN-DOWN FOR EROSION CONTROL.
**MAY NOT ADVERSELY AFFECT DRAINAGE OF NEIGHBORING PROPERTIES**
**WORK DONE IN ROW REQUIRES A PERMIT FROM PUBLIC WORKS.**
(9/22/2015 3:10 PM TD)
ADDED 45 SQ FT OF CONCRETE TO PERMIT.