Notes:
84 SQ FT, SADD / ENCLOSED PATIO
5/14/2015 12:00:00 AM
BALCONY REPAIRS / ROOF ADDITION / ENCLOSED PATIO 2ND FLOOR
102. * ALL WORK PERFORMED MUST MEET THE 2012 IRC STANDARDS AND ABIDE BY THE CITY OF FRISCO COMPREHENSIVE ZONING ORDINANCE, AND ALL OTHER CITY ORDINANCES.
106. BALCONY RAILING SPACING IS 3 3/4" AND RAILING HEIGHT BETWEEN 34'' AND 38'' REQ'D.
107. BALCONY RAILING SHALL BE ANCHORED TO EXISTING STRUCTURE. MUST BE ABLE TO WITHSTAND A 200 LB. LATERAL LOAD.
108. ALL WOOD MUST BE WEATHER TREATED.
109. AN ENGINEER'S INSPECTION AND FINAL LETTER OF ACCEPTANCE IS REQ'D.
110. NO ELECTRICAL OR PLUMBING PERMIT REQUESTED OR ISSUED.
111. TEMP'D.GLAZING WHERE REQ'D.
112. THE METHOD OF ATTACHMENT OF NEW BALCONY TO EXISTING HOME MUST BE VISIBLE AT TIME OF INSPECTION.
ROOF ADDITION TO MEET THE 2012 IRC STANDARDS.
84 SF ENCLOSED ROOM/PATIO MUST MEET THE CURRENT CODES FOR ELECTRICAL, HVAC AND ENERGY.
113. SUBJECT TO FIELD INSPECTION APPROVAL. CALL (972) 292-5386 FOR INSPECTION.