Notes:
SALT / REROOF
5/11/2015 12:00:00 AM
* ALL WORK PERFORMED MUST MEET THE 2012 IRC STANDARDS AND ABIDE BY THE CITY OF FRISCO COMPREHENSIVE ZONING ORDINANCE, AND ALL OTHER CITY ORDIANCES.
SUBJECT TO FIELD INSPECTION APPROVAL.
* STRUCTURAL OR MECHANICAL ELEMENTS SHALL NOT BE VISIBLE FROM SIX FEET ABOVE THE GRADE OF ADJACENT STREET.
MAY NOT PROJECT ABOVE THE HIGHEST POINT OF THE BUILDING.
*REROOFING: MUST COMPLY WITH SECTION R907 PAGE 450 OF THE 2012 IRC
*WHERE THE APPLICATION OF A NEW ROOF COVERING OVER WOOD SHINGLE OR SHAKE ROOFS CREATES A COMBUSTIBLE CONCEALED SPACE, THE ENTIRE EXISTING SURFACE SHALL BE COVERED WITH GYPSUM BOARD, MINERAL FIBER-GLASS FIBER OR OTHER APPROVED MATERIALS SECURELY FASTENED IN PLACE.
CALL (972) 292-5386 FOR INSPECTION.