Notes:
3437 AC, 4205 SF, SFR / 2 STORY
9/19/2014 12:00:00 AM
001. COMPLIANCE WITH THE AMENDED (06/18/13) ZONING ORDINANCE.
002. COMPLIANCE WITH THE 2012 BUILDING CODES, LOCAL AMENDMENTS AND PLANNED DEVELOPMENT REQUIREMENTS.
003. TERMITE BARRIER PROTECTION REQ'D AT ALL SLAB PENETRATIONS.
011. BEAMS=10"W X 26"D.
021. FRONT ENTRY CURB CUT PER ENCLOSED DESIGN SKETCH WITH DRIVEWAY MAXIMUM WIDTH 24 FEET.
041. TEMPERED GLASS REQ'D AT WINDOWS AND PARTITIONS WITHIN 2' OF DOOR OPENINGS.
042. TEMPERED GLASS REQ'D AT ALL BATHROOM HAZARD LOCATIONS, INCLUDING WINDOWS AND PARTITIONS IF GLAZING IS LESS THAN 60" ABOVE ANY STANDING/WALKING SURFACE.
043. TEMPERED GLASS AT FLOAT GLASS WINDOWS GREATER THAN 9 SQ FT, LESS THAN 18" OFF FINISH FLOOR, WITHIN 3'-0" OF A WALKING SURFACE.
044. MINIMUM OF 24" ON SILL HEIGHT AT 2ND STORY OPERABLE WINDOWS.
049. FUEL BURNING APPLIANCE INSTALLATION WITHIN AN AC AREA MUST BE CODE COMPLIANT.
056. LANDSCAPE IRRIGATION SYSTEM REQUIRES DESIGN APPROVAL PRIOR TO REQUEST FOR FINAL INSPECTION (CO).
057. ET BASED CONTROLLER REQUIRED FOR AUTOMATIC IRRIGATION SYSTEMS PER CITY ORDINANCE ZA06-0005 DATED 11/24/2006.
058. GREEN BUILDING VENTILATION REQUIREMENT BASED ON ASHARAE 62.2 STANDARD.
059. DRIVEWAY, LEADWALK & GARAGE DOOR ENHANCEMENT & TREATMENT PER THE ENCLOSED
060. THIS SUBDIVISION MAY REQUIRE H.O.A. DESIGN APPROVAL PRIOR TO PERMIT AND CONSTRUCTION.
061. SEE ENCLOSED SHEET FOR WOOD FENCE CONSTRUCTION AND (OR) ORNAMENTAL IRON AS PER PD REQUIREMENT.
2nd FLOOR: 2-BED ROOMS, 1 1/2 BATHS, GAME & THEATER ROOMS.