Notes:
SALT / CONCRETE DRIVEWAY REPLACEMENT
9/8/2014 12:00:00 AM
102. * ALL WORK PERFORMED MUST MEET THE 2012 IRC STANDARDS AND ABIDE BY THE CITY OF FRISCO COMPREHENSIVE ZONING ORDINANCE, AND ALL OTHER CITY ORDINANCES.
106. *** NO ELECTRICAL OR PLUMBING PERMIT REQUESTED OR ISSUED ***
107. *** ARBOR, PATIO COVER, FIREPLACE, FIRE PIT, OUTDOOR KITCHEN (BBQ GRILL, SINK, ETC) NOT REQUESTED OR PERMITTED.
116. * 8" DEPTH THE FIRST FOOT IN FROM THE LIP OF THE STREET/ALLEY.
117. * IF METER WITHIN 3' OF DRIVEWAY, NEED TO INSTALL BALLARD.
118. *** NEED A FLATWORK INSPECTION BEFORE THE POUR. ***
119. ***ALL WORK PERFORMED MUST MEET THE 2012 IRC STANDARDS AND ABIDE BY THE CITY OF FRISCO COMPREHENSIVE ZONING ORDINANCE, AND ALL OTHER CITY ORDINANCES.