Notes:
SALT / REROOF
6/20/2014 12:00:00 AM
* ALL WORK PERFORMED MUST MEET THE 2012 IRC STANDARDS AND ABIDE BY THE CITY OF FRISCO COMPREHENSIVE ZONING ORDINANCE, AND ALL OTHER CITY ORDIANCES.
SUBJECT TO FIELD INSPECTION APPROVAL.
CALL (972) 292-5386 FOR INSPECTION.
* STRUCTURAL OR MECHANICAL ELEMENTS SHALL NOT BE VISIBLE FROM SIX FEET ABOVE THE GRADE OF ADJACENT STREET.
MAY NOT PROJECT ABOVE THE HIGHEST POINT OF THE BUILDING.
*REROOFING: MUST COMPLY WITH SECTION R907 PAGE 450 OF THE 2012 IRC
*WHERE THE APPLICATION OF A NEW ROOF COVERING OVER WOOD SHINGLE OR SHAKE ROOFS CREATES A COMBUSTIBLE CONCEALED SPACE, THE ENTIRE EXISTING SURFACE SHALL BE BE COVERED WITH GYPSUM BOARD,MINERAL FIBER,GLASS FIBER OR OTHER APPROVED MATERIALS SECURELY FASTENED IN PLACE.