Notes:
5924 AC, 6791 SF, SFR / 2 STORY
5/9/2014 12:00:00 AM
001. COMPLIANCE WITH THE AMENDED (06/18/13) ZONING ORDINANCE.
002. COMPLIANCE WITH THE 2012 BUILDING CODES, LOCAL AMENDMENTS AND PLANNED DEVELOPMENT REQUIREMENTS.
014. BEAMS=10"W X 30"D.
021. FRONT ENTRY CURB CUT PER ENCLOSED DESIGN SKETCH WITH DRIVEWAY MAXIMUM WIDTH 24 FEET.
032. RESIDENTIAL STUCCO REQUIRES LATH & EXPANDED WIRE MESH WITH CEMENT PLASTER.
040. TEMPERED GLASS REQ'D AT WINDOWS ADJACENT TO STAIRS
050. DOUBLE UNDERLAYMENT REQUIRED ON COMPOSITION ROOFS WITH A 4:12 PITCH OR LESS
052. AUTOMATIC FIRE SPRINKLERS REQ'D W/ DESIGN & INSTALLATION APPROVED BY FIRE MARSHAL.
055. WRITTEN COMPLIANCE WITH E.O.R. FOUNDATION DESIGN NOTE(S) REQ'D BY BUILDER PRIOR TO THE START OF CONSTRUCTION. COPY SAME TO THE CITY OF FRISCO IN THE PERMIT POUCH.
056. LANDSCAPE IRRIGATION SYSTEM REQUIRES DESIGN APPROVAL PRIOR TO REQUEST FOR FINAL INSPECTION (CO).
057. ET BASED CONTROLLER REQUIRED FOR AUTOMATIC IRRIGATION SYSTEMS PER CITY ORDINANCE ZA06-0005 DATED 11/24/2006.
058. GREEN BUILDING VENTILATION REQUIREMENT BASED ON ASHARAE 62.2 STANDARD.
059. DRIVEWAY, LEADWALK & GARAGE DOOR ENHANCEMENT & TREATMENT PER THE ENCLOSED
060. THIS SUBDIVISION MAY REQUIRE H.O.A. DESIGN APPROVAL PRIOR TO PERMIT AND CONSTRUCTION.
061. SEE ENCLOSED SHEET FOR WOOD FENCE CONSTRUCTION AND (OR) ORNAMENTAL IRON AS PER PD REQUIREMENT.
2ND FLOOR: 3BR, 3BA, GAME, MEDIA,