Notes:
6380 AC, 8331 SF, SFR / 2 STORY
4/24/2014 12:00:00 AM
002. COMPLIANCE WITH THE 2012 BUILDING CODES, LOCAL AMENDMENTS AND PLANNED DEVELOPMENT REQUIREMENTS.
003. TERMITE BARRIER PROTECTION REQ'D AT ALL SLAB PENETRATIONS.
005. RETAINING WALLS TWO (2) FT OR TALLER MUST BE OF ENGINEERED DESIGN.
008. BEAMS=8"W X 28"D.
037. STAIR VERTICAL RISE OF 12' OR GREATER REQUIRES AN INTERMEDIATE LANDING
039. TEMPERED GLASS REQ'D AT STAIR LANDING WINDOW(S).
040. TEMPERED GLASS REQ'D AT WINDOWS ADJACENT TO STAIRS
052. AUTOMATIC FIRE SPRINKLERS REQ'D W/ DESIGN & INSTALLATION APPROVED BY FIRE MARSHAL.
053. ONLY THE EOR STRUCTURE FRAME AND DETAILS ARE INCLUDED AS PART OF THIS ISSUED BUILDING PERMIT.
056. LANDSCAPE IRRIGATION SYSTEM REQUIRES DESIGN APPROVAL PRIOR TO REQUEST FOR FINAL INSPECTION (CO).
057. ET BASED CONTROLLER REQUIRED FOR AUTOMATIC IRRIGATION SYSTEMS PER CITY ORDINANCE ZA06-0005 DATED 11/24/2006.
058. GREEN BUILDING VENTILATION REQUIREMENT BASED ON ASHARAE 62.2 STANDARD.
060. THIS SUBDIVISION MAY REQUIRE H.O.A. DESIGN APPROVAL PRIOR TO PERMIT AND CONSTRUCTION.
061. SEE ENCLOSED SHEET FOR WOOD FENCE CONSTRUCTION AND (OR) ORNAMENTAL IRON AS PER PD REQUIREMENT.
SEE SLABTEK DETAILS FOR PIERS
2ND FLOOR: 4BR, 4BA, PLAYROOM, MEDIA, FRONT BALCONY, COVERED BALCONY, WETBAR, TECH ROOM