Notes:
3658 AC, 4830 SF, SFR / 2 STORY
4/14/2014 12:00:00 AM
001. COMPLIANCE WITH THE AMENDED (06/18/13) ZONING ORDINANCE.
002. COMPLIANCE WITH THE 2012 BUILDING CODES, LOCAL AMENDMENTS AND PLANNED DEVELOPMENT REQUIREMENTS.
003. TERMITE BARRIER PROTECTION REQ'D AT ALL SLAB PENETRATIONS.
005. RETAINING WALLS TWO (2) FT OR TALLER MUST BE OF ENGINEERED DESIGN.
014. BEAMS=10"W X 30"D.
021. FRONT ENTRY CURB CUT PER ENCLOSED DESIGN SKETCH WITH DRIVEWAY MAXIMUM WIDTH 24 FEET.
027. PROVIDE EXPANSION JOINTS IN MASONARY FACADE.
030. SIDING & TRIM MUST BE CEMENT FIBER OR ENGINEERED TREATED WOOD PRODUCT.
036. ATTIC STORAGE MUST NOT BE CONVERTED TO HABITABLE LIVING AREA WITHOUT A BUILDING PERMIT
050. DOUBLE UNDERLAYMENT REQUIRED ON COMPOSITION ROOFS WITH A 4:12 PITCH OR LESS
053. ONLY THE EOR STRUCTURE FRAME AND DETAILS ARE INCLUDED AS PART OF THIS ISSUED BUILDING PERMIT.
056. LANDSCAPE IRRIGATION SYSTEM REQUIRES DESIGN APPROVAL PRIOR TO REQUEST FOR FINAL INSPECTION (CO).
057. ET BASED CONTROLLER REQUIRED FOR AUTOMATIC IRRIGATION SYSTEMS PER CITY ORDINANCE ZA06-0005 DATED 11/24/2006.
058. GREEN BUILDING VENTILATION REQUIREMENT BASED ON ASHARAE 62.2 STANDARD.
059. DRIVEWAY, LEADWALK & GARAGE DOOR ENHANCEMENT & TREATMENT PER THE ENCLOSED
060. THIS SUBDIVISION MAY REQUIRE H.O.A. DESIGN APPROVAL PRIOR TO PERMIT AND CONSTRUCTION.
061. SEE ENCLOSED SHEET FOR WOOD FENCE CONSTRUCTION AND (OR) ORNAMENTAL IRON AS PER PD REQUIREMENT.
2ND FLOOR: 2BR, 2BA, GAME,