Notes:
3576 AC, 4413 SF, SFR / 2 STORY SEE B13-1951
2/20/2013 12:00:00 AM
002. COMPLIANCE WITH THE 2006 BUILDING CODES, AMENDMENT AND PLANNED DEVELOPMENT REQUIREMENTS.
003. TERMITE PROTECTION REQ'D AT ALL SLAB PENETRATIONS.
009. BEAMS=10"W X 26"D.
022. SEE ENCLOSED SHEET FOR WOOD FENCE CONSTRUCTION.
025. TEMPERED GLASS REQ'D AT WINDOWS WITHIN 2' OF DOOR OPENINGS.
029. TEMPERED GLASS AT FLOAT GLASS WINDOWS GREATER THAN 9 SQ FT, LESS THAN 18" OFF FINISH FLOOR, WITHIN 3'-0" OF A WALKING SURFACE.
033. MEDIA ROOM WITH CLOTHING STORAGE MUST HAVE A CODE COMPLIANT EGRESS WINDOW.
035. 2 X 6 PLUMBING (VENT STACK/WASTE) WALLS REQ'D AT ALL FIXTURES.
041. DOUBLE UNDERLAYMENT REQUIRED ON COMPOSITION ROOFS WITH A 4:12 PITCH OR LESS-MINIMUM PITCH 2:12.
042. THIS SUBDIVISION MAY REQUIRE H.O.A. DESIGN APPROVAL PRIOR TO PLAN SUBMITTAL AND CONSTRUCTION.
046. FRONT ENTRY CURB CUT PER ENCLOSED DESIGN SKETCH WITH DRIVEWAY MAXIMUM WIDTH 24".
048. LANDSCAPE IRRIGATION SYSTEM, IF INSTALLED, REQUIRES DESIGN APPROVAL PRIOR TO REQUEST FOR FINAL INSPECTION (CO).
049. GREEN BUILDING VENTILATION REQUIREMENT BASED ON ASHARAE 62.2 STANDARD.
050. ET BASED CONTROLLER REQUIRED FOR AUTOMATIC IRRIGATION SYSTEMS PER CITY ORDINANCE ZA06-0005 DATED 11/24/2006.
059. INCLUDED IN THIS PERMIT PACK IS THE REQUIRED BARRIER-FREE RAMP; USE THE APPROPRIATE DETAIL FIGURE 1 OR 1a.
060. ONLY THE EOR STRUCTURE FRAME AND DETAILS ARE INCLUDED AS PART OF TIHS ISSUED BUILDING PERMIT.