Notes:
4272 AC, 5041 SF, SFR / 2 STORY
2/6/2013 12:00:00 AM
001. COMPLIANCE WITH THE APRIL 5, 2011 ZONING ORDINANCE REQUIRED.
002. COMPLIANCE WITH THE 2006 BUILDING CODES, AMENDMENT AND PLANNED DEVELOPMENT REQUIREMENTS.
003. TERMITE PROTECTION REQ'D AT ALL SLAB PENETRATIONS.
010. BEAMS=10"W X 28"D.
022. SEE ENCLOSED SHEET FOR WOOD FENCE CONSTRUCTION.
025. TEMPERED GLASS REQ'D AT WINDOWS WITHIN 2' OF DOOR OPENINGS.
029. TEMPERED GLASS AT FLOAT GLASS WINDOWS GREATER THAN 9 SQ FT, LESS THAN 18" OFF FINISH FLOOR, WITHIN 3'-0" OF A WALKING SURFACE.
033. MEDIA ROOM WITH CLOTHING STORAGE MUST HAVE A CODE COMPLIANT EGRESS WINDOW.
034. SIDING & TRIM MUST BE CEMENT FIBER OR ENGINEERED TREATED WOOD PRODUCT.
036. MINIMUM OF 24" ON SILL HEIGHT AT 2ND STORY OPERABLE WINDOWS.
037. DRIVEWAY SLOPE MUST NOT EXCEED 12%; PLOT PLANS WITH GRADES ARE REQUIRED.
042. THIS SUBDIVISION MAY REQUIRE H.O.A. DESIGN APPROVAL PRIOR TO PLAN SUBMITTAL AND CONSTRUCTION.
046. FRONT ENTRY CURB CUT PER ENCLOSED DESIGN SKETCH WITH DRIVEWAY MAXIMUM WIDTH 24".
048. LANDSCAPE IRRIGATION SYSTEM, IF INSTALLED, REQUIRES DESIGN APPROVAL PRIOR TO REQUEST FOR FINAL INSPECTION (CO).
049. GREEN BUILDING VENTILATION REQUIREMENT BASED ON ASHARAE 62.2 STANDARD.
050. ET BASED CONTROLLER REQUIRED FOR AUTOMATIC IRRIGATION SYSTEMS PER CITY ORDINANCE ZA06-0005 DATED 11/24/2006.
058. DRIVEWAY, LEADWALK & GARAGE DOOR ENHANCEMENT & TREATMENT PER ENCLOSED SHEET (CZO PG 188).