Notes:
4082 AC, 4921 SF, SFR / 2 STORY
11/17/2011 12:00:00 AM
002. COMPLIANCE WITH THE 2006 CODES, AMENDMENTS, ORDINANCES & SUBDIVISION REQUIREMENTS.
003. TERMITE PROTECTION REQ'D AT ALL SLAB PENETRATIONS.
009. BEAMS=10"W X 26"D.
025. TEMPERED GLASS REQ'D AT WINDOWS WITHIN 2' OF DOOR OPENINGS.
029. TEMPERED GLASS AT FLOAT GLASS WINDOWS GREATER THAN 9 SQ FT, LESS THAN 18" OFF FINISH FLOOR, WITHIN 3'-0" OF A WALKING SURFACE.
031. SIDING DIRECTLY OVER MASONRY AT SECOND STORY IS NOT ALLOWED.
032. SECOND FLOOR SIDING AREA MUST NOT EXCEED 50% OF THE TOTAL NET EXPOSED WALL AREA.
034. SIDING & TRIM MUST BE CEMENT FIBER OR ENGINEERED TREATED WOOD PRODUCT.
035. 2 X 6 PLUMBING (VENT STACK/WASTE) WALLS REQ'D AT ALL FIXTURES.
038. RETAINING WALLS TWO (2) FT OR TALLER MUST BE OF ENGINEERED DESIGN.
039. RESIDENTIAL STUCCO REQUIRES LATH & EXPANDED WIRE MESH WITH CEMENT PLASTER.
042. THIS SUBDIVISION MAY REQUIRE H.O.A. DESIGN APPROVAL PRIOR TO PLAN SUBMITTAL AND CONSTRUCTION.
048. LANDSCAPE IRRIGATION SYSTEM, IF INSTALLED, REQUIRES DESIGN APPROVAL PRIOR TO REQUEST FOR FINAL INSPECTION (CO).
049. GREEN BUILDING VENTILATION REQUIREMENT BASED ON ASHARAE 62.2 STANDARD.
050. ET BASED CONTROLLER REQUIRED FOR AUTOMATIC IRRIGATION SYSTEMS PER CITY ORDINANCE ZA06-0005 DATED 11/24/2006.
054. PROVIDE EXPANSION JOINTS IN MASONARY FACADE.