Notes:
1. ALL WORK PERFORMED MUST MEET THE 2006 INTERNATIONAL BUILDING CODE, LOCAL AMENDMENTS AND ABIDE BY THE CITY OF FRISCO COMPREHENSIVE ZONING ORDINANCE AND ALL OTHER CITY ORDINANCES.
2. INSTALLATION OF EXIT SIGNAGE SUBJECT TO SIGHT-LINE FIELD INSPECTION.
3. COMPLIANCE WITH ADA/TAS REQUIREMENTS REQUIRED.
4. SUBJECT TO FIRE MARSHAL APPROVAL AND INSPECTION.
*** RAMP REQUIRED TO BE INSTALLED TO PROVIDE ACCESSIBLE ROUTE TO PUBLIC WAY.
*** MAINTAIN 1 HR TENANT SEPARATION.
*** IF 1HR CORRIDORS WERE PROVIDED WITH ORIGINAL CONSTRUCTION, THIS MUST BE MAINTAINED THROUGHOUT NEW TENANT RENOVATIONS. SUBJECT TO FIELD VERIFICATION.
*** DEFERED ENGINEERED EVALUATION AND ANALYSIS OF ADDITONAL HVAC LOADS ON BUILDING REQUIRED PRIOR TO INSTALLATION OF NEW RTU.
8330 SQ FT, CIFO / MANHATTAN SOFTWARE