Notes:
2628 AC, 3264 SF, SFR / 2 STORY
6/17/2011 12:00:00 AM
(6/17/2011 3:48 PM JC)
001. ENERGY STAR/GREEN BLDG/90 DAY DIRECTIVE EFF 04/01/2011.
002. COMPLIANCE WITH THE 2006 CODES, AMENDMENTS, ORDINANCES & SUBDIVISION REQUIREMENTS.
003. TERMITE PROTECTION REQ'D AT ALL SLAB PENETRATIONS.
010. BEAMS=10"W X 28"D.
024. EXITWAYS (HALLWAYS) MUST BE A MIN. 36"W INCLUDING ARCHED OR CASED OPENINGS. (TWO OR MORE ROOMS)
029. TEMPERED GLASS AT FLOAT GLASS WINDOWS GREATER THAN 9 SQ FT, LESS THAN 18" OFF FINISH FLOOR, WITHIN 3'-0" OF A WALKING SURFACE.
035. 2 X 6 PLUMBING (VENT STACK/WASTE) WALLS REQ'D AT ALL FIXTURES.
036. MINIMUM OF 24" ON SILL HEIGHT AT 2ND STORY OPERABLE WINDOWS.
042. THIS SUBDIVISION MAY REQUIRE H.O.A. DESIGN APPROVAL PRIOR TO PLAN SUBMITTAL AND CONSTRUCTION.
043. COMPLIANCE WITH E.O.R. FOUNDATION DESIGN NOTE(S) REQ'D. BY BUILDER PRIOR TO THE START OF CONSTRUCTION. COPY SAME TO THE CITY OF FRISCO.
044. CO DETECTORS REQ'D ON ELECTRICAL LEGEND & ELECTRICAL PLAN 1/1000 SQ. FT. & 1 PER FLOOR MINIMUM WITH (1) ON THE AC SIDE OF THE GARAGE DOOR.
048. LANDSCAPE IRRIGATION SYSTEM, IF INSTALLED, REQUIRES DESIGN APPROVAL PRIOR TO REQUEST FOR FINAL INSPECTION (CO).
049. GREEN BUILDING VENTILATION REQUIREMENT BASED ON ASHARAE 62.2 STANDARD.
050. ET BASED CONTROLLER REQUIRED FOR AUTOMATIC IRRIGATION SYSTEMS PER CITY ORDINANCE ZA06-0005 DATED 11/24/2006.
054. PROVIDE EXPANSION JOINTS IN MASONARY FACADE.
059. INCLUDED IN THIS PERMIT PACK IS A DRAWING AND SPECIFICATION OF THE REQUIRED BARRIER-FREE RAMP.
060. ONLY THE EOR STRUCTURE FRAME AND DETAILS ARE INCLUDED AS PART OF TIHS ISSUED BUILDING PERMIT.
(6/17/2011 3:48 PM JC)
2nd. story with a bonus room.