Notes:
001. ENERGY STAR/GREEN BLDG/90 DAY DIRECTIVE EFF 04/01/2011.
002. COMPLIANCE WITH THE 2006 CODES, AMENDMENTS, ORDINANCES & SUBDIVISION REQUIREMENTS.
003. TERMITE PROTECTION REQ'D AT ALL SLAB PENETRATIONS.
008. BEAMS=10"W X 24"D.
023. GARAGE MUST BE A MIN. 18'W X 20'D CLEAR SHEET ROCK TO SHEET ROCK.
026. TEMPERED GLASS REQ'D AT ALL BATHROOM HAZARD LOCATIONS.
029. TEMPERED GLASS AT FLOAT GLASS WINDOWS GREATER THAN 9 SQ FT, LESS THAN 18" OFF FINISH FLOOR, WITHIN 3'-0" OF A WALKING SURFACE.
030. 1ST FLOOR WINDOW BOX-OUTS MUST HAVE MASONRY BELOW.
042. THIS SUBDIVISION MAY REQUIRE H.O.A. DESIGN APPROVAL PRIOR TO PLAN SUBMITTAL AND CONSTRUCTION.
043. COMPLIANCE WITH E.O.R. FOUNDATION DESIGN NOTE(S) REQ'D. BY BUILDER PRIOR TO THE START OF CONSTRUCTION. COPY SAME TO THE CITY OF FRISCO.
048. LANDSCAPE IRRIGATION SYSTEM, IF INSTALLED, REQUIRES DESIGN APPROVAL PRIOR TO REQUEST FOR FINAL INSPECTION (CO).
049. GREEN BUILDING VENTILATION REQUIREMENT BASED ON ASHARAE 62.2 STANDARD.
050. ET BASED CONTROLLER REQUIRED FOR AUTOMATIC IRRIGATION SYSTEMS PER CITY ORDINANCE ZA06-0005 DATED 11/24/2006.
051. WINDOW BOX-OUTS MUST NOT EXCEED TWICE THE WINDOW M.O. AREA.
054. PROVIDE EXPANSION JOINTS IN MASONARY FACADE.
3624 AC, 4356 SF, SFR / 2 STORY