Notes:
3086 AC, 3890 SF, SFR / 2 STORY
6/14/2011 12:00:00 AM
001. ENERGY STAR/GREEN BLDG/90 DAY DIRECTIVE EFF 04/01/2011.
002. COMPLIANCE WITH THE 2006 CODES, AMENDMENTS, ORDINANCES & SUBDIVISION REQUIREMENTS.
003. TERMITE PROTECTION REQ'D AT ALL SLAB PENETRATIONS.
008. BEAMS=10"W X 20"D.
025. TEMPERED GLASS REQ'D AT WINDOWS WITHIN 2' OF DOOR OPENINGS.
026. TEMPERED GLASS REQ'D AT ALL BATHROOM HAZARD LOCATIONS.
029. TEMPERED GLASS AT FLOAT GLASS WINDOWS GREATER THAN 9 SQ FT, LESS THAN 18" OFF FINISH FLOOR, WITHIN 3'-0" OF A WALKING SURFACE.
031. SIDING DIRECTLY OVER MASONRY AT SECOND STORY IS NOT ALLOWED.
036. MINIMUM OF 24" ON SILL HEIGHT AT 2ND STORY OPERABLE WINDOWS.
042. THIS SUBDIVISION MAY REQUIRE H.O.A. DESIGN APPROVAL PRIOR TO PLAN SUBMITTAL AND CONSTRUCTION.
046. FRONT ENTRY CURB CUT PER ENCLOSED DESIGN SKETCH.
048. LANDSCAPE IRRIGATION SYSTEM, IF INSTALLED, REQUIRES DESIGN APPROVAL PRIOR TO REQUEST FOR FINAL INSPECTION (CO).
049. GREEN BUILDING VENTILATION REQUIREMENT BASED ON ASHARAE 62.2 STANDARD.
050. ET BASED CONTROLLER REQUIRED FOR AUTOMATIC IRRIGATION SYSTEMS PER CITY ORDINANCE ZA06-0005 DATED 11/24/2006.
2nd FLOOR: BONUS ROOM AND BATH.
NOTE: SIDING CAN NOT BE USED ON THE BONUS ROOM AS SHOWN; THAT AREA MUST BE CANTILEVERED 4"TO 6" FOR SIDING OR USE CONVENTIONAL STUCCO OR BRICK DIRECTLY OVER BRICK BRICK BELOW.