Notes:
APPROX 720 SQ FT, SALT / EXTEND PATIO & BALCONY
4/7/2011 12:00:00 AM
102. * ALL WORK PERFORMED MUST MEET THE 2006 IRC STANDARDS AND ABIDE BY THE CITY OF FRISCO COMPREHENSIVE ZONING ORDINANCE, AND ALL OTHER CITY ORDINANCES.
103. SUBJECT TO FIELD INSPECTION APPROVAL. CALL (972) 292-5386 FOR INSPECTION.
105. *** NEED A FLATWORK INSPECTION BEFORE THE POUR. ***AND ENGINEER'S SUMMARY LETTER AFTER COMPLETION.
148. ***LAG BOLT MUST PENETRATE MAIN HOUSE STUD MIN 1 ½".
176. * ISOKERN FIREPLACE MUST MEET MANUFACTURERS SPECIFICATIONS.
(4/7/2011 9:59 AM CSW)
•PATIO COVERS SHALL COMPLY WITH THE CURRENT IRC APPENDIX H.
•BALCONIES SHALL COMPLY WITH THE CURRENT IBC CHAPTERS 8, 14 SECTIONS 1407.4, 1407.5 & 1407.6. CHAPTER 15 SECTION 1504.1. CHAPTER 16 SECTIONS 1603.1.1, 1603.1.2, 1603.1.4 & 1604.4
•WHERE A ROOF ASSEMBLY IS CONSTRUCTED OVER A BALCONY CONSTRUCTION SHALL COMPLY WITH CHAPTER 9 OF THE IRC AND/OR CHAPTER 15 OF THE IBC.
•PLANS SHALL MATCH SITE CONSTRUCTION, PLANS TO REMAIN ON SITE THROUGHOUT CONSTRUCTION, NO EXCEPTIONS.
•BALCONY STRUCTURES AND DECKING ABOVE SHALL SUPPORT LIVE AND DEAD LOADS ACCORDING TO R301.2.2.2.1 & T.R301.5 ALONG WITH T. R301.7.
•RAILING HEIGHT AND SPACING REQ’MENTS SHALL COMPLY WITH SECTIONS R312.1 & R312.2 RESPECTIVELY.