Notes:
212150 SQ FT, CNEW / FOREST PARK GARAGE STRUCTURE & BRIDGE
2/25/2011 12:00:00 AM
(2/25/2011 10:49 AM RET)
REVIEW TYPE: ELECTRICAL REVIEWER:ROBERT E THOMAS
ELECTRICAL ORDINANCE 08-01-10
THESE ARE GENERAL NOTES: ITEMS CAN BE VERIFIED IN THE FIELD.PRIMARY AND SECONDARY PROTECTION IS REQ'D. ON TRANSFORMERS. TAP RULES WILL APPLY.
0.1 MINIMUM #12 COPPER COUNDUCTORS PERMITED EXCEPT FOR CONTROLS. LIGHTING COMCHHECK COMPUATIONS MUST MATCH PLANS.
0.2 ONLY ALUMINIM WIRE PERMITTED IN SERVICE ENTRANCE AND FEEDERS 1/0 AND LARGER STABIL-ALLOY SERIES 6000 & 8000
03. PULL EQUIPMENT GROUNDS IN ALL RACEWAYS.
04. PROVID EXIT AND EMERGENVY LIGHTING AS NOTED AND REQUIRED PER 2006 IBC.
05. LIGHTING AND CONTROLS SHALL COMPLY WITH 2006 IECC WHERE APPLICABLE.
0.6 ALL EXTERIOR LIGHTING SHALL COMPLY WITH COMPREHENSIVE ZONING ORDINANCE ARTICLR IV SECTION 6 LIGHTING & GLARE REQIRMENTS.
0.7ALL ELECTRICAL INSTALLATIONS WILL BE SUBJECT TO FIELD INSPECTIONS AND INSPECTOR APPROVALS.
08. ALL CONDUCTORS MUST TERMINATE IN DEVICES THAT HAVE BEEN PROPERLY TIGHTENED TO MANUFACTURER'S TORQUE SPECIFICATIONS USING THE PROPER TORQUE TOOL.
09. REFER TO CITY ORDINANCE SECTION 6 LIGHTING AND GLARE REQUIREMENTS.
0.10 AN AS- BUILD LEGIBLE PANEL SCHEDULE SHALL BE AFFIXED TO THE INSIDE OF ELECTRICAL PANELS FOR EACH TENANT.
011. ELECTRICAL WILL BE DESIGNED AND INSTALLED PER THE 2005 NATIONAL ELECTRICAL CODE WITH LOCAL AMENDMENTS STATED IN CITY OF FRISCO ORDINANCE 08-01-10 ALONG WITH THE FOLLOWING COMMENTS
0.12 ANY WIRE/CONDUCTOR USED IN HVAC PLENUM AREA SHALL BE PLENUM RATED.
0.13 GROUNDING AND BONDING SHALL COMPLY WITH ARTICLE 250. BUILDING .STRUCTURAL STEEL, GROUND ROD, COPPER DOMESTIC COLD WATER PIPE (UFER IF AVAILABLE PER NEC ARTICLE 250.81
Also see Notes on Prints GE1.1 & GE2.1