Notes:
3897 AC, 4732 SF, SFR / 2 STORY
10/18/2010 12:00:00 AM
001. ENERGY STAR / GREEN BUILDING.
002. COMPLIANCE WITH THE 2006 CODES, AMENDMENTS, ORDINANCES & SUBDIVISION REQUIREMENTS.
003. TERMITE PROTECTION REQ'D AT ALL SLAB PENETRATIONS.
008. BEAMS=10"W X 24"D.
025. TEMPERED GLASS REQ'D AT WINDOWS WITHIN 2' OF DOOR OPENINGS.
026. TEMPERED GLASS REQ'D AT ALL BATHROOM HAZARD LOCATIONS.
029. TEMPERED GLASS AT FLOAT GLASS WINDOWS GREATER THAN 9 SQ FT, LESS THAN 18" OFF FINISH FLOOR, WITHIN 3'-0" OF A WALKING SURFACE.
036. MINIMUM OF 24" ON SILL HEIGHT AT 2ND STORY OPERABLE WINDOWS.
042. THIS SUBDIVISION MAY REQUIRE H.O.A. DESIGN APPROVAL PRIOR TO PLAN SUBMITTAL AND CONSTRUCTION.
046. FRONT ENTRY CURB CUT PER ENCLOSED DESIGN SKETCH.
048. LANDSCAPE IRRIGATION SYSTEM, IF INSTALLED, REQUIRES DESIGN APPROVAL PRIOR TO REQUEST FOR FINAL INSPECTION (CO).
049. GREEN BUILDING VENTILATION REQUIREMENT BASED ON ASHARAE 62.2 STANDARD.
050. ET BASED CONTROLLER REQUIRED FOR AUTOMATIC IRRIGATION SYSTEMS PER CITY ORDINANCE ZA06-0005 DATED 11/24/2006.
055. FUEL BURNING APPLIANCE INSTALLATION MUST BE CODE COMPLIANT.
059. INCLUDED IN THIS PERMIT PACK IS A DRAWING AND SPECIFICATION OF THE REQUIRED BARRIER-FREE RAMP.
2nd FLOOR: 3-BED ROOMS, 2-BATHS, NOOK, GAME AND MEDIA ROOMS WITH A WET BAR.
The BUILDER HAS SUBMITTED NEW ENGINEERED FOUNDATION AND A REVISED PLOT PLAN TO CHANGE THE FINISHED FLOOR ELEVATION FROM 742.02 FEET TO 743.02.