Notes:
113 SQ FT, SALT / ENCLOSE PATIO
9/30/2010 12:00:00 AM
1. SILL PLATE SHALL BE ANCHORED WITH CONCRETE ANCHORS, POWDER ACTUATED NAIL [SHOT NAILING] WILL PRODUCE SPALLING, POCKING AND CRACKING ON MATURE CONCRETE DURING DRY CLIMATE.
2. POLY SEAL THE SILL PLATE, THE RECOMMENDATION IS TO USE A LIQUID NAIL OR CONCRETE GLUE TO COMPLETELY SEAL THE BOTTOM PLATE.
3. TWO INSPECTIONS ARE REQ'D.
MISC. FRAME
MISC. BLDG. FINAL.
4. IT WILL BE UPON THE INSPECTORS DISCRETION TO COMBINE BOTH INSPECTIONS AND FINAL THE PERMIT AT THE MISC. FRAME DUE TO THE SIZE OF THE JOB.
5. CONSTRUCTION SHALL COMPLY WITH THE 2006 IRC. THE CONTRACTOR MUST CALL IN FOR INSPECTION.
6. THE STAMPED APPROVED PLANS MUST REMAIN ON SITE THROUGHOUT CONSTRUCTION.